|
2016 WASTEWATER RATE SCHEDULE |
Effective date July 1, 2016
|
|
|
|
|
First |
2,000 gallons |
minimum bill $23.64 |
All Over |
2,000 gallons |
$6.87/thousand gallons |
|
|
|
METER SIZE |
MINIMUM BILL |
USAGE UP TO MINMUM |
¾ inch |
$23.64 |
2,000 gallons |
1 inch |
$40.82 |
4,500 gallons |
1 ½ inch |
$188.52 |
26,000 gallons |
2 inch |
$312.18 |
44,000 gallons |
3 inch |
$483.93 |
69,000 gallons |
4 inch |
$813.69 |
117,000 gallons |
6 inch |
$1,507.56 |
218,000 gallons |
8 inch |
$2,201.43 |
319,000 gallons |
10 inch |
$2,895.30 |
420,000 gallons |
12 inch |
$3,589.17 |
521,000 gallons |
|
|
|
|
|
REGULAR TAP $900.00
PLUS BORE COST IF APPLICABLE ON ALL TAPS
SEWER TAPS WILL BE AT SAME COST OF WATER METER |
|
|
|
TRDA Fee- $1500.00
if applicable in addition to tap fee.
Construction cost of Pump Systems - All
construction cost of grinder pumps, step system
or other types of on-site system is to be paid
by individuals or POA. TASS will furnish
standard specifications and will inspect construction
prior to making service tap. |
|
|
|
|
|
|
|
|
|
|
|